Infrastructure added in last 5 years

  1. Fleet of own 7 buses and a staff car.
  2. Construction of toilet block and maths lab.
  3. Teaching aids including Green/ White boards and audio-video system.
  4. Purchasing of additional land.
  5. Purchasing of new furniture to accommodate the increased strength (600 desks).
  6. Setting up of 2 computer labs. Equipped with 3 air conditioners and 55 computers.
  7. A submersible pump has been installed in the school campus to meet the ever increasing water requirements of school.
  8. Installation of 20 KVA generator.

Infrastructure (Proposed Plans)

  1. Construction of another building block of 24 rooms having rooms for Music, Yoga, Drawing, Seminar, Gym, Canteen, Auditorium and class rooms.
  2. Construction of a Yagyashala at Branch School.
  3. Purchasing instruments for school band.